We engaged with Utilligence to commission a designing pack for our 320 MW project Mallard Pass Solar Farm. From the beginning, communications were fluid and clear as they understood our needs. The offered to generate two different planning designs with two different panel layout options which allowed us to narrow down the specifications for the final single line diagram and site layout. They were able to flag rapidly any risk during the design process and communicated with us following our methods.