

info@utilligence.co


+44 (0) 1444 226 365
  • Home
  • Services
    • 132kv substation engineering
    • Design and build engineering
    • ICP contractor & grid connection services
    • Microgrids & private power networks
    • Power system & G99 studies
    • Renewable energy engineering consultants
    • Solar farm repowering & commercial solar services
  • Products
    • Prefabricated substations & bespoke units
    • Transformers
    • Switchgear and substation equipment
  • Case studies
    • Bryn Blaen Wind Farm
    • Mallard Pass Solar Farm
    • Palau Solar Power
    • Shoreham Harbour wind turbines
    • Shuttleworth Solar Farm: Fast-track grid connection
    • St Helens: Backup power generation
    • UK short term operating reserve (STOR)
    • Warne Road STOR site
    • West Carclaze solar farm
  • About us
  • Careers
  • Pacific Island Renewables
  • Palau Solar
  • News
  • Contact
Why we’ve traded carbon credits for ‘Good Deeds’

Why we’ve traded carbon credits for ‘Good Deeds’

Dec 16, 2025 | Net Zero, Utilligence

  Utilligence’s engineering philosophy is rooted in pragmatism. We build solutions where the inputs, outputs and benefits are measurable, durable and clear. For some time though, a facet of our CSR programme has felt at odds with this principle: our participation...
For solar park and substation project tenders, a client engineer should always be part of the project

For solar park and substation project tenders, a client engineer should always be part of the project

Jun 5, 2025 | Utilligence

  By Kevin Hann, CTO, Utilligence.  As part of our work, we often find ourselves working through complex tenders for solar parks and substations. One recurring challenge is that the specifications we have been given often contain significant technical issues,...
Why the North Hyde power outage must be a wake-up call for energy resilience

Why the North Hyde power outage must be a wake-up call for energy resilience

May 15, 2025 | Net Zero, safety, Uncategorized, Utilligence

  The sudden loss of power at North Hyde substation and Heathrow Airport in March 2025 was more than just an outage — it was a stark reminder of how fragile our energy infrastructure can be. NESO’s Interim Report has revealed critical vulnerabilities in system...
The Spain-Portugal power outage – Separating fact from speculation

The Spain-Portugal power outage – Separating fact from speculation

Apr 29, 2025 | Net Zero, Utilligence

  Yesterday’s widespread Spain-Portugal power outage has generated multiple theories, ranging from plausible grid failures to the curious ‘rare atmospheric phenomenon’ explanation from Portuguese grid operator Ren.  While investigations continue, our early...
The slowdown of onshore wind in Scotland: A wake-up call for the renewable energy sector 

The slowdown of onshore wind in Scotland: A wake-up call for the renewable energy sector 

Mar 20, 2025 | Net Zero

  As an Independent Connection Provider (ICP) specialising in renewable energy connections, we have witnessed firsthand the transformative potential of onshore wind in Scotland. Over the years, we have seen this sector evolve, contributing significantly to the...
« Older Entries

Search here

Recent Posts

  • Hear from Utilligence CEO, Ross Waddington on The UK’s Green Shift
  • The Great British Grid won’t fix the problem It claims to solve
  • Congratulations to Beth and Kimberley!
  • Building the next generation of graduate engineers at Utilligence 
  • Utilligence 2026 team day

Archives

  • 2026
  • 2025
  • 2024
  • 2023
  • 2022

Categories

  • Middle East Crisis
  • Net Zero
  • safety
  • Uncategorized
  • Utilligence



Utilligence Ltd

Company reg: 8688403



+44 (0) 1444 226 365


info@utilligence.co


Privacy Policy

Designed by TC-IT Services © 2025 All Rights Reserved